ACTIVE PROJECT
PROJECT 001
Project setup
Recycled Water Pipeline Extension · Construction Management & Inspection
Project document register
| Document | Type | Revision | Status | Updated | Actions |
|---|---|---|---|---|---|
| IFC Drawing SetSheets G-001 through E-412 | Plans | Rev 2 | Current | Sep 8 | |
| Technical SpecificationsDivisions 01–46 | Specifications | Addendum 3 | Current | Sep 8 | |
| Schedule Update 07Data date September 11 | Schedule | UPD-07 | Review | Sep 12 | |
| 24-inch Pipe DataSubmittal 33 11 00-02 | Submittal | Rev 1 | Approved | Aug 29 |
MONDAY · SEPTEMBER 14
Tomorrow’s work
Tell the system what the contractor actually intends to perform.
Install 24-inch recycled-water pipeline
Sta. 42+50 to 45+00 · East transmission alignment
Valve Vault VV-04 concrete placement
Sta. 45+32 · Structure VV-04
Existing system tie-in preparation
Connection Point CP-02 · No shutdown tomorrow
PROJECT-SPECIFIC PREPARATION
Let the documents identify tomorrow’s work
The system will use the latest applicable three-week look-ahead with the plans, specifications and other project sources. If the contractor reported additional work, enter it in the preparation panel.
DAILY INSPECTION PREP · DRAFT
Daily field guide
Generate a project-specific guide from Tomorrow’s Work.
24-inch pipeline installation
A1450 · Sta. 42+50–45+00
Verify line, grade, trench width, stable subgrade and 6-inch minimum prepared bedding.
Record manufacturer, lot, visible damage, approved joint materials and protective end caps.
Check cleanliness, insertion depth, joint alignment, deflection and continuous grade.
Photograph bedding, each fitting and restrained joint before concealment. Record station limits.
Required testing
Coordinate before work begins
- ✓Bedding density
One test per 200 LF per lift.
- ✓Concrete testing
Slump, air, temperature and cylinders.
- !Testing firm confirmation
No technician shown on tomorrow’s coordination log.
Open questions
Resolve before concealment
Open · Response required Sep 15. Does not block tomorrow’s pipe run.
Record actual start and notify RE for schedule reconciliation.
Valve Vault VV-04 placement
A1620 · 9:30 AM · 32 CY
FIELD RECORD · MONDAY SEPTEMBER 14
Daily field notes
Capture facts once. Reuse them for the daily report and as-built timeline.
Observation
Observation log
2 entriesContractor limits match the daily plan. Existing utility marks visible from Sta. 42+50 through 43+75.
Sta. 42+50 · General observationNo pumping observed. Requested density technician confirmation before bedding placement.
Sta. 42+62 · Quality controlDAILY FIELD REPORT
Daily field report
Record observations and complete the report in one place throughout the day.
SECTION 01
Conditions and shift
SECTION 02
Contractor manpower
SECTION 03
Work activities & observations
Record field observations here as the work happens. Each saved observation becomes part of today’s report.
SECTION 04
Daily schedule alignment
This comparison is assembled automatically from the Daily Prep Guide and the work activities and observations already recorded in this report.
This record does not determine responsibility, entitlement, delay, or critical-path impact.
SECTION 05
Equipment
| Contractor / equipment | Operating | Idle | Inspected |
|---|---|---|---|
| CAT 336 ExcavatorWest Coast Pipeline | 7.5 hr | 0.5 hr | Yes |
| CAT 950 LoaderWest Coast Pipeline | 6.0 hr | 2.0 hr | Yes |
| Grove RT CranePacific Structures | 4.5 hr | 3.5 hr | Yes |
| Water TruckWest Coast Pipeline | 3.0 hr | 5.0 hr | Not recorded |
Carry today’s four equipment items into Tuesday’s draft report.
SECTION 06
Inspections and testing
Test reports are pending. The app will keep both items open until the laboratory reports are attached.
SECTION 07
Extra Work / Time and Material
Recording labor, equipment, materials, or work performed does not authorize extra work, acknowledge entitlement, approve pricing, or approve a change order. All entitlement and compensation remain subject to the Contract and written Owner approval.
Record actual daily resources and quantities only. Do not enter rates, markups, or dollar amounts.
SECTION 08
Deficiency List
Maintain the ongoing list of deficient work. Add a dated field note whenever the condition changes; close the item when the correction is verified.
SECTION 09
Photos and captions
SECTION 10
Certify and distribute
- Add captions to two photographs.
- Record whether the water truck was inspected.
Peter Brennan · Resident Engineer · Project records
WEEKLY PROGRESS MEETING RECORD
Weekly schedule compliance report
Factual comparison assembled from the dated Daily Field Reports. This report does not assign responsibility or determine delay.
No weekly report has been built for this period
The application will compare the schedule, contractor-stated plan, and inspector observations already captured in each Daily Field Report.
COMMERCIAL & FIELD CONTROL
Issues & potential changes
Track unresolved field matters and evaluate possible cost or schedule changes.
PROJECT DOCUMENT CONTROL
RFIs & Submittals
Create, review, and track RFIs, submittals, and monthly pay requests.
ACME WORKSPACE
Team access
Everyone on the active ACME team can view every project in this pilot workspace.
Add a team member
Prepare access, then send the program link to the person.
Workspace team
Active members and invitations awaiting signup.
Loading team access…
PROJECT CONTROLS
Project intelligence
What the field record says versus what the schedules and documents say.
A1450 field start is seven days ahead of P6 Update 07.
Tomorrow’s concrete placement has no confirmed testing technician.
RFI-027 response is needed before CP-02 tie-in preparation.
As-built activity timeline
Built automatically from inspector records
Site clearing
24-inch pipeline
Valve Vault VV-04
Project health
82Seven-day inspection horizon
Likely preparation needs based on the look-ahead and field trend
PROJECT SETUP
Add new project
Create a separate workspace for the project documents, activities and field records.
PROJECT DOCUMENTS
Upload project documents
Choose where these files belong. The system will not guess from the filename or file extension.
DAILY REPORT
Add entry
CONTRACTOR SUBMISSION
New submittal
RFI RECORD
RFI details
ISSUE CONTROL
New issue
ONGOING FIELD RECORD